| 2026-08-19 | DUOS TECHNOLOGIES GROUP, INC. | Hosting/Colocation Agreement | 500 | 55 | Duos Edge AI signs five-year service orders with Axe Compute for 55 MW of AI data center capacity across multiple U.S. sites ($500mm+ base payments) in a 51/49 JV with up to $140mm Axe equity, expanding on a 10 MW, $111mm colocation deal at Columbus, Georgia |
| 2026-08-19 | Ionic Digital Inc. | Lease | — | 234 | Ionic Digital begins receiving cash rent on a 234 MW digital infrastructure lease at its Ward County, Texas campus and advances expansion to 700 MW by end of 2027, plus conversion of 112 MW at Midland to AI data centers |
| 2026-08-17 | Vulcan Infrastructure & Power Inc. | Equity Financing | 39 | 104 | Machine Investment Group, Atlas Holdings and Conversant Capital lead $39.4mm PIPE into Greenidge Generation, renamed Vulcan Infrastructure & Power, to redeem 2026 notes and convert its 104 MW Dresden, NY plant and Mississippi/North Dakota powered land into AI/HPC data center capacity |
| 2026-08-13 | Fermi Inc. | Lease | 6,500 | 222 | Fermi signs 15-year, ~$6.5bn binding turnkey lease with TensorWave for 222 MW at Project Matador in the Texas Panhandle, plus a 2.6 GW build-own-operate-transfer power alliance with Hillcore |
| 2026-08-13 | Soluna Holdings, Inc | Joint Venture | — | 100 | Soluna Q2 2026 results: signs Kati 2 AI joint venture with Metrobloks for 100 MW critical IT Phase I expandable to 350 MW, acquires 150 MW Briscoe Wind Farm for $53mm and buys out Dorothy 1 JV partners |
| 2026-08-11 | Energy Vault Holdings, Inc. | Power/Interconnection Agreement | 500 | 1,250 | Energy Vault signs contract to deploy 1.25 GW of integrated power, storage and software infrastructure with a power-generation EPC (Caterpillar gas engines) for a hyperscaler AI data center in Texas, expected to generate $500-600mm of revenue through 2027; also broke ground on Snyder, TX powered-shell campus for Crusoe |
| 2026-08-11 | 1606 CORP. | Other | — | 55 | 1606 Corp. engages MDM Group on success-fee basis to market its planned ~132-acre, 55 MW behind-the-meter Lufkin, East Texas power campus to AI infrastructure buyers, off-takers and JV partners |
| 2026-08-10 | Riot Platforms, Inc. | Lease | 9,100 | 191 | Riot Platforms signs 20-year, 191 MW critical IT build-to-suit data center lease with a leading frontier AI lab at its Rockdale, Texas campus worth ~$9.1bn, backed by a $573mm Morgan Stanley interim financing facility |
| 2026-08-10 | Babcock & Wilcox Enterprises, Inc. | Power/Interconnection Agreement | 2,400 | 1,200 | Babcock & Wilcox progresses $2.4bn, 1.2 GW behind-the-meter natural gas steam power project for Base Electron's AI factory near Center, North Dakota, and secures an additional 1 GW of Siemens Energy steam turbines for its next data center project |
| 2026-08-06 | MARA Holdings, Inc. | Land Acquisition | — | 2,000 | MARA secures rights via definitive agreement to a 2 GW powered land site in Matagorda County, Texas for a digital infrastructure campus, advances the pending Long Ridge acquisition and raises $600mm of BTC-backed credit facilities from Coinbase and Two Prime to fund it |
| 2026-08-06 | MDU RESOURCES GROUP INC | Power/Interconnection Agreement | — | 430 | MDU Resources' electric utility signs electric service agreement with Applied Digital to serve the 430 MW Polaris Forge 3 AI Factory near Center, North Dakota, pending North Dakota PSC approval |
| 2026-08-05 | Galaxy Digital Inc. | Debt Financing | 3,500 | 260 | Galaxy Digital completes $3.5bn senior secured notes due 2031 to fund Helios Phase II (260 MW critical IT) for CoreWeave in West Texas after delivering Phase I (200 MW gross / 133 MW IT), and adds three Texas sites (Merlin, Caspian, Selene) taking its power pipeline to 5.7 GW |
| 2026-08-05 | IRON MOUNTAIN INC | Lease | — | 110 | Iron Mountain leases 110 MW of data center capacity year-to-date through July 2026 (13 MW in Q2, 75 MW in July), including 51 MW in Mumbai and 25 MW in London to major global hyperscalers |
| 2026-08-05 | TERAWULF INC. | Lease | 19,000 | 401 | TeraWulf signs 20-year, ~$19bn lease with Anthropic for ~401 MW of critical IT capacity at its Justified Data Campus in Hawesville, Kentucky; also acquires the 1 GW Muskie Data Campus (Grayson, KY) and agrees to sell its 50.1% Abernathy JV interest for ~$530mm |
| 2026-08-04 | Z Squared Inc. | Acquisition | 30 | 8 | Z Squared agrees to acquire 100% of Paradox Data, LLC, an 8 MW AI-compute site in El Dorado, Arkansas, for $5mm in preferred stock at closing plus up to $25mm in milestone preferred tied to reaching 50/100/150 MW |
| 2026-08-04 | Hut 8 Corp. | Lease | 9,800 | 352 | Hut 8 Q2 2026 results: signs second 15-year 352 MW IT lease at Beacon Point (~$9.8bn base-term value) with the same investment-grade tenant, lifting contracted AI capacity to 949 MW / ~$26.6bn, and closes $7.5bn of investment-grade project financing for River Bend and Beacon Point Phase 1 |
| 2026-08-04 | Cipher Digital Inc. | Debt Financing | 810 | 700 | Cipher closes $810mm 6.000% senior secured notes to fully fund its Stingray data center, amends Black Pearl hyperscale lease to accelerate first capacity delivery (rent commenced August 2026), and acquires option on 900 MW Apollo site near San Antonio |
| 2026-08-04 | Hyperscale Data, Inc. | Hosting/Colocation Agreement | 1,200 | 20 | Hyperscale Data subsidiary Alliance Cloud Services signs 10-year MSA with a California-based neocloud provider for initial 20 MW of critical AI compute (expandable to 52 MW) at its Michigan data center campus, worth >$1.2bn over the maximum term |
| 2026-08-03 | Jet.AI Inc. | Equity Financing | 2 | 200 | Jet.AI invests $1.75mm via majority-owned SG Canada InvestCo for ~26% stake in StratGrid, developer of a ~200 MW behind-the-meter natural gas-powered AI data center campus (Project Wheatland) in Alberta |
| 2026-07-30 | NorthWestern Energy Group, Inc. | Development Agreement | — | 150 | NorthWestern Energy Q2 2026 results disclose development agreements with Sabey Data Centers, Atlas Power and Quantica Infrastructure to supply electric service to Montana data centers, 150 MW starting late 2027 growing to ~1,500 MW by 2030 |
| 2026-07-30 | XCEL ENERGY INC | Power/Interconnection Agreement | — | — | Xcel Energy's NSP-Minnesota enters electric service agreement to power a new Google data center in Minnesota, with Google paying all costs and a proposed Clean Energy Accelerator Charge for 1,900 MW of clean energy resources filed with the MPUC |
| 2026-07-28 | Galaxy Digital Inc. | Debt Financing | 3,507 | 260 | Galaxy Helios Data Centers II LLC closes $3.507 billion of 9.875% senior secured notes due 2031 to build two data center buildings (8 data halls, 400 MW utility / 260 MW critical IT) in Dickens County, Texas leased to CoreWeave |
| 2026-07-28 | Core Scientific, Inc./tx | Hosting/Colocation Agreement | — | 500 | Core Scientific and AMD announce infrastructure partnership under which AMD secures 500+ MW of U.S. AI data center capacity beginning in 2027, expandable to 2.5 GW, with AMD receiving market-priced warrants |
| 2026-07-28 | Core Scientific, Inc./tx | Lease | 14,000 | 530 | Core Scientific Q2 2026 earnings release highlights AMD partnership with 15-year colocation agreements for ~530 MW across five sites (>$14bn potential base contracted revenue) with potential to expand to 2.5 GW of leasable capacity |
| 2026-07-27 | Applied Digital Corp. | Lease | 20,200 | 810 | Applied Digital signs three 15-year take-or-pay leases (~$20bn) with the same U.S. investment-grade hyperscaler for 810 MW of critical IT: 300 MW at Delta Forge 1 (Boyce, LA), 300 MW at Polaris Forge 3 (ND) and 210 MW at Delta Forge 2, and closes $1.59bn 7.000% senior secured notes for Polaris Forge 1 Building 4 |
| 2026-07-24 | SLB LIMITED/NV | Other | — | 1,000 | SLB selected as delivery partner (modular infrastructure manufacturing through building fit-out) for Meta's planned 1 GW data center in Sturgeon County, Alberta; announces Liberty Energy alliance for data center power |
| 2026-07-23 | DIGITAL REALTY TRUST, INC. | Acquisition | 3,500 | 288 | Digital Realty acquires JV partners' 64% stake in three fully leased Northern Virginia hyperscale data centers (288 MW IT) at ~$7.8bn gross value for ~$3.5bn, alongside $475mm Kansas City powered-land purchase (2 GW) and pending Columbia Capital acquisition |
| 2026-07-23 | Empery Digital Inc. | Equity Financing | 20 | 750 | Empery Digital closes $20mm preferred equity investment (~8% stake) in Cardinal Data Power as part of a ~$70mm Series A funding CDP's 750 MW Phase I behind-the-meter data center campus in West Texas |
| 2026-07-22 | Apex Treasury Corp | SPAC Merger | 4,000 | 77 | TECfusions, an AI data center developer with sites in Virginia, Arizona and Pennsylvania, signs SPAC business combination with Apex Treasury Corp at a $4.0 billion pre-money equity value plus a $35 million PIPE |
| 2026-07-16 | SharonAI Holdings Inc. | Other | 1,320 | — | Sharon AI signs US$1.32bn five-year cloud computing service agreement with a global AI lab to be delivered from data center infrastructure in New Zealand |
| 2026-07-13 | PLUG POWER INC | Sale/Divestiture | 142 | 164 | Plug Power agrees to sell its Graham, Texas project (164 MW interconnection) to Stream Data Centers for up to $76.5 million and restructures the $142 million New York Gateway site sale to Stream into a staged closing |
| 2026-07-10 | AZIO AI HOLDINGS, INC. | Hosting/Colocation Agreement | 28 | 3 | Azio AI (formerly Envirotech Vehicles) signs $27.9mm power purchase and AI infrastructure hosting agreement with Power Champion for initial 3.1 MW GPU deployment, expandable to 12 MW (~$100mm) |
| 2026-07-09 | CleanCore Solutions, Inc. | Joint Venture | 100 | 200 | CleanCore Solutions (ZONE) closes joint venture with HST Technologies to develop a 200 MW West Texas AI data center campus (expandable to 500+ MW), committing up to $100 million initial capital for a 99% interest |
| 2026-07-09 | Fermi Inc. | Debt Financing | 941 | 1,500 | Fermi July 2026 investor update on Project Matador, a 7,570-acre gas-and-nuclear powered AI campus in Amarillo, Texas targeting up to 1.5 GW by YE2027 (6 GW air permit, up to 17 GW long term), backed by ~$941mm of equipment and corporate debt commitments from MUFG, Keystone, Beal Bank and Yorkville |
| 2026-07-07 | Envirotech Vehicles, Inc. | Acquisition | — | 6 | Envirotech Vehicles closes all-stock merger with Azio AI to become an AI data center provider, with 6 MW of off-grid modular data centers deployed in South Texas and rights to a 548-acre site scalable to 500 MW |
| 2026-07-06 | Big Digital Energy, Inc. | Development Agreement | — | 300 | Big Digital Energy signs LOI to acquire a ~50-acre power-ready ERCOT industrial site in the Dallas-Fort Worth area, via a planned 50/50 JV with 10NetZero, to develop a 300+ MW AI data center |
| 2026-06-30 | Blue Acquisition Corp/Cayman | Lease | 2,800 | 300 | Blockfusion (SPAC target of Blue Acquisition Corp) signs non-binding LOI with a leading AI customer for up to 300 MW anchor lease at its Niagara Falls, NY campus (85 MW take-or-pay, ~$2.8bn over 15 years) alongside a $175mm convertible note term sheet |
| 2026-06-29 | Edgemode, Inc. | Sale/Divestiture | — | 300 | Edgemode signs non-binding offer to sell its 300 MW IT off-grid 'DC Malpica AI' ready-to-build data center project in Mora (Toledo), Spain to Spark AI Foundry Holdings at EUR 1mm per permitted MW |
| 2026-06-26 | Z Squared Inc. | Acquisition | 5 | 8 | Z Squared signs binding LOI to acquire majority interest in Paradox Data and its Union County Campus in El Dorado, Arkansas (8 MW energized, targeting up to 150 MW firm power) for $5mm of Series D convertible preferred |
| 2026-06-23 | Cerebras Systems Inc. | Other | 20,000 | 750 | Cerebras Q1 2026 earnings release announces multi-year agreement for OpenAI to deploy 750 MW of Cerebras inference compute valued at more than $20bn, plus an $850mm revolver to accelerate data center acquisitions |
| 2026-06-22 | DIGITAL REALTY TRUST, INC. | Acquisition | 644 | 2,000 | Digital Realty acquires 1,440 acres at Astra Enterprise Park near Kansas City (2 GW utility power at full delivery) for ~$377.6mm plus OP units, agrees to buy ~16% more of Teraco for ~$644.4mm in stock, and agrees to acquire Columbia Capital for ~$510mm |
| 2026-06-22 | HIVE Digital Technologies Ltd. | Hosting/Colocation Agreement | 220 | — | HIVE's BUZZ HPC closes a three-year ~US$220mm sovereign AI GPU cloud contract with Bell AI Fabric for Cohere, deploying 2,304 NVIDIA GB200 GPUs at Bell's data centre in Merritt, British Columbia |
| 2026-06-17 | VisionWave Holdings, Inc. | Joint Venture | 40 | 10 | VisionWave signs term sheet with Lucky Whale Production for a joint venture to develop an underground Tier IV data center campus in Beth Shemesh, Israel, with ~$40mm all-share consideration for a 51% effective interest |
| 2026-06-16 | Applied Digital Corp. | Debt Financing | 1,590 | 150 | Applied Digital subsidiary APLD ComputeCo 3 closes $1.59bn 7.000% senior secured notes due 2031 to fund 150 MW critical IT ELN-04 building leased to CoreWeave at Polaris Forge 1, Ellendale, North Dakota |
| 2026-06-15 | Hyperscale Data, Inc. | Hosting/Colocation Agreement | 1,000 | 20 | Hyperscale Data in advanced negotiations on a master services agreement to provide 20 MW of critical AI compute colocation capacity at its Michigan campus, expected to be worth over $1.0bn over 20 years, with expansion to 52 MW worth ~$2.5bn |
| 2026-06-12 | SharonAI Holdings Inc. | Other | — | 72 | Sharon AI signs six-year strategic compute collaboration with NVIDIA to enable 72 MW of new AI factory data center capacity in Australia with up to 40,000 Grace Blackwell GB300 GPUs under a revenue-sharing and credit-support model |
| 2026-06-10 | Hut 8 Corp. | Debt Financing | 4,250 | 352 | Hut 8 subsidiary Beacon Point DC LLC closes $4.25 billion 6.129% senior secured notes due 2042 to build a 352 MW six-data-hall turnkey data center in Nueces County, Texas leased to an AA- or better rated tenant |
| 2026-06-10 | Nixxy, Inc. | Acquisition | 1,000 | 120 | Nixxy signs binding LOI with Tachyon9 for a rollup creating a NASDAQ-listed AI infrastructure and energy platform, anchored by the ~$1bn, 1 GW behind-the-meter gas-powered Nakota data center project in Williston, North Dakota (first 120 MW targeted Q2 2027) |
| 2026-06-09 | Soluna Holdings, Inc | Joint Venture | — | 350 | Soluna forms joint venture with Metrobloks affiliate DC Kati Venture LLC to develop the 350 MW multi-phase Project Kati 2 data center in Willacy County, Texas |
| 2026-06-09 | Applied Digital Corp. | Lease | 5,200 | 210 | Applied Digital signs 210 MW, 15-year take-or-pay lease (~$5.2bn base-term revenue) with a U.S. investment-grade hyperscaler at its Delta Forge 2 AI Factory campus in a new southern state |
| 2026-06-09 | Axe Compute Inc. | Other | 260 | 5 | Axe Compute files supplemental risk factors for its ~$260mm take-or-pay enterprise GPU compute contract requiring 4.8 MW of committed power in a single third-party data center facility, targeted for Q3 2026 deployment |
| 2026-06-08 | CleanCore Solutions, Inc. | Development Agreement | — | — | CleanCore Solutions announces pivot to AI critical infrastructure and a non-binding LOI (dated May 7, 2026) to acquire a majority interest in an SPV developing a data center project in the midwestern U.S. (the Midwest Project) |
| 2026-06-02 | HIVE Digital Technologies Ltd. | Land Acquisition | — | 200 | HIVE FY2026 results: acquires 25-acre Greater Toronto Area site for CAD $58mm to develop a 320 MW (200 MW IT load) AI gigafactory targeted online 2H 2027 with ~CAD $3.5bn capex, and closes $115mm 0% exchangeable notes due 2031 |
| 2026-06-01 | BlockchAIn Digital Infrastructure, Inc. | Power Purchase Agreement | — | 65 | BlockchAIn executes 15-year Electric Service Agreement expanding contracted utility load at its CLT-01 AI/HPC data center campus from 40 MW to 65 MW |
| 2026-05-26 | TERAWULF INC. | Acquisition | — | 1,000 | TeraWulf acquires 1+ GW Muskie Data Campus HPC development site in Eastern Kentucky from Industrial Equity Partners |
| 2026-05-21 | Jet.AI Inc. | Joint Venture | — | 500 | Jet.AI Q1 2026 results: Convergence Compute JV with Consensus Core secures natural gas supply equivalent to 500 MW of generation for its Manitoba hyperscale data center campus and completes third milestone set |
| 2026-05-21 | Z Squared Inc. | Acquisition | — | 24 | Z Squared signs binding LOI to acquire Skycore Digital's three energized North Carolina sites (24 MW connected, expandable to 42 MW via Duke Energy authorizations) as first step toward 100 MW AI inference capacity plan |
| 2026-05-20 | Soluna Holdings, Inc | Acquisition | 9 | 50 | Soluna acquires remaining 49% equity interest in Project Dorothy 1B (Silverton, TX) from Navitas Global for ~$8.8mm, taking 100% ownership of the 50 MW Dorothy 1 campus ahead of AI/HPC conversion |
| 2026-05-19 | DUOS TECHNOLOGIES GROUP, INC. | Hosting/Colocation Agreement | 176 | 5 | Duos Technologies Q1 2026 call: advances Hydra Host GPU-as-a-Service agreement (2,304 NVIDIA GPUs, ~$176mm over 36 months, $15mm deposit received) and 4.8 MW high-power colocation contract for a leading hyperscaler in its edge data centers; 10 MW contracted with 15 MW more planned in 2026 |
| 2026-05-19 | BlockchAIn Digital Infrastructure, Inc. | Lease | 400 | 20 | BlockchAIn Digital Infrastructure investor deck highlights $400mm+ TCV LOI with a global cloud provider for a 20 MW build-to-suit AI facility at its South Carolina CLT01 campus, plus 25 MW of non-binding LOIs and 395 MW pipeline |
| 2026-05-19 | New ERA Energy & Digital, Inc. | Debt Financing | 290 | 200 | New Era Energy & Digital Q1 2026 update: Macquarie up to $290mm project-level credit facility plus $115mm equity offering, Stream Data Centers JV LOI and a definitive agreement to acquire a 54-acre corridor for the 1.4 GW Texas Critical Data Center (TCDC) campus in Ector County, TX |
| 2026-05-14 | Fermi Inc. | Debt Financing | 785 | 2,000 | Fermi America closes ~$785M of equipment financing (led by $500M MUFG facility) and secures >2 GW of gas generation for its Project Matador behind-the-meter AI campus in Carson County, Texas, with binding tenant agreement still pending |
| 2026-05-12 | HIVE Digital Technologies Ltd. | Other | 3 | 50 | HIVE's BUZZ HPC contracts a ~$3.1mm fibre optic network overbuild with a Canadian carrier (Bell Canada) at its 70 MW Grand Falls, New Brunswick campus being converted to a 50 MW Tier III AI data center |
| 2026-05-11 | IREN Ltd | Hosting/Colocation Agreement | 3,400 | 60 | IREN signs $3.4bn five-year AI Cloud contract with NVIDIA for ~60 MW of air-cooled Blackwell GPU capacity at Childress, Texas, paired with a $2.1bn NVIDIA equity investment tied to GPU deployment, plus acquisitions of Nostrum Group (490 MW secured power, Spain) and Mirantis |
| 2026-05-11 | Babcock & Wilcox Enterprises, Inc. | Other | 2,400 | 1,200 | Babcock & Wilcox investor overview highlighting $2.4bn EPC contract to build 1.2 GW natural gas-fired power facility for Base Electron (backed by Applied Digital) serving an AI Factory campus in North Dakota |
| 2026-05-11 | MARA Holdings, Inc. | Acquisition | — | 505 | MARA signs definitive agreement to acquire Long Ridge Energy & Power (505 MW nameplate CCGT on 1,600 acres in PJM adjacent to its Hannibal site) from FTAI Infrastructure to build an AI/critical-IT data center campus scalable to 600 gross MW |
| 2026-05-08 | Digi Power X Inc. | Hosting/Colocation Agreement | 1,100 | 40 | Digi Power X signs 10-year, ~40 MW Data Center Colocation and Master Services Agreement with Cerebras Systems at its Columbiana, Alabama AI campus worth ~$1.1bn initial term |
| 2026-05-08 | IREN Ltd | Other | 3,400 | 60 | IREN signs 5-year $3.4bn AI Cloud contract with NVIDIA for air-cooled Blackwell GPUs within 60 MW of existing Childress, Texas data centers, plus 5 GW strategic partnership and $2.1bn NVIDIA investment rights |
| 2026-05-08 | TERAWULF INC. | Debt Financing | 250 | 480 | TeraWulf closes $250mm revolving credit facility and acquires the 480 MW grid-connected Hawesville, Kentucky HPC site; 60 MW energized for Core42 at Lake Mariner and Abernathy 168 MW JV delivery targeted Q4 2026 |
| 2026-05-06 | Core Scientific, Inc./tx | Debt Financing | 3,300 | — | Core Scientific Finance I LLC issues $3.3 billion 7.750% senior secured notes due 2031 backed by CoreWeave colocation license agreements at six data center sites in Texas, Georgia, North Carolina and Oklahoma |
| 2026-05-06 | BLACK HILLS CORP /SD/ | Power/Interconnection Agreement | 201 | 1,800 | Black Hills' Wyoming Electric signs agreement with prospective customer to procure long lead-time generation equipment to serve a 1.8 GW data center in Wyoming, backed by $201M in refundable contributions in aid of construction |
| 2026-05-05 | Solaris Energy Infrastructure, Inc. | Debt Financing | 1,300 | 2,200 | Solaris Energy Infrastructure markets $1.3bn senior notes and a $650mm MUFG-led revolver to fund behind-the-meter power contracts for AI data centers, disclosing a new >600 MW 10-year Master Equipment Rental Agreement with 'Customer C' |
| 2026-05-05 | Cipher Digital Inc. | Lease | 200 | 100 | Cipher Digital signs third AI data center campus lease (~100 MW gross, 15-year initial term) with an investment-grade hyperscale tenant and closes $200mm revolving credit facility; Barber Lake and Black Pearl builds on schedule |
| 2026-05-05 | Energy Vault Holdings, Inc. | Development Agreement | — | 100 | Energy Vault adds 100 MW of Powered Land and Powered Shell projects for AI data center infrastructure (land rights and interconnection agreement completed for 75 MW Powered Land site), expected to yield >$65M annual EBITDA within 12-18 months |
| 2026-05-01 | Hut 8 Corp. | Debt Financing | 3,250 | 245 | Hut 8 subsidiary Hut 8 DC LLC closes $3.25 billion 6.192% senior secured notes due 2042 to fund the 245 MW River Bend data center in St. Francisville, Louisiana leased to Fluidstack with a Google guarantee |
| 2026-04-30 | Riot Platforms, Inc. | Lease | 636 | 50 | AMD exercises 25 MW expansion option under its Rockdale, Texas data center lease with Riot Platforms, bringing contracted critical IT capacity to 50 MW ($636mm total contract revenue over 10-year term) with options for up to 200 MW |
| 2026-04-30 | XCEL ENERGY INC | Power/Interconnection Agreement | — | — | Xcel Energy's NSP-Minnesota signs electric service agreement to power a new Google data center in Minnesota, with Google paying all costs of service and ~$1.1bn of expected customer benefits; MPUC approval requested April 2026 |
| 2026-04-29 | CalEthos, Inc. | Debt Financing | 15 | 300 | CalEthos borrows $15 million from director-affiliated SFO IDF LLC (8% note due 2028 plus warrants) to fund its proposed joint venture with GW Finance for the 524-acre Raft River Data Center Campus, granting SFO IDF 50% of Phase 1 site-sale proceeds |
| 2026-04-28 | Galaxy Digital Inc. | Lease | — | 526 | Galaxy delivers first Helios data hall to CoreWeave under 526 MW critical IT / 800 MW gross Phase I-III leases and receives ERCOT approval for an additional 830 MW, bringing approved campus capacity to 1.63 GW |
| 2026-04-27 | Core Scientific, Inc./tx | Power/Interconnection Agreement | — | 600 | Core Scientific secures incremental 300 MW gross utility power under contract and 200+ acres at its Pecos, Texas campus, with a plan (incl. behind-the-meter generation) to scale the AI data center campus to ~1.5 GW gross / ~1.0 GW leasable power |
| 2026-04-27 | Solaris Energy Infrastructure, Inc. | Power Purchase Agreement | — | 600 | Solaris signs third long-term contract to provide over 600 MW of behind-the-meter power capacity with balance of plant to an affiliate of an investment-grade global technology company for 10 years (plus 5-year option) for data center use, deploying late 2026 through 2028 |
| 2026-04-23 | DIGITAL REALTY TRUST, INC. | Acquisition | 117 | 15 | Digital Realty 1Q26: agrees to acquire TelcoHub 1 data center and buys a 15 MW Cyberjaya, Malaysia development for ~$117mm, acquires land in Portland (160 MW) and Milan, and signs the largest hyperscale lease in company history |
| 2026-04-23 | Applied Digital Corp. | Lease | 7,500 | 300 | Applied Digital signs ~15-year, ~$7.5bn lease with a new U.S. investment-grade hyperscaler for 300 MW of critical IT load at its 430 MW Delta Forge 1 AI Factory campus in Louisiana |
| 2026-04-21 | Core Scientific, Inc./tx | Debt Financing | — | 590 | Core Scientific Finance I LLC launches proposed senior secured notes offering backed by six data centers (590 MW critical IT / 900 MW grid) across five sites 100% licensed to CoreWeave under ~$10bn of contracts |
| 2026-04-16 | Soluna Holdings, Inc | Acquisition | 16 | 150 | Soluna acquires Spring Lane Capital's 85.4% Class B interest in Project Dorothy 1A (Silverton, TX) for $16.5mm, taking 100% ownership and funding part with a $12mm unsecured promissory note |
| 2026-04-15 | BlockchAIn Digital Infrastructure, Inc. | Lease | — | 25 | BlockchAIn Digital Infrastructure investor deck: 25 MW South Carolina site conversion under LOI for build-to-suit AI hosting with 10-year contemplated term, 40 MW operating in South Carolina and 25 MW Minnesota site in development |
| 2026-04-13 | SharonAI Holdings Inc. | Sale/Divestiture | 74 | — | Sharon AI receives accelerated payment of the US$50mm promissory note and true-up shares from New Era Energy & Digital, bringing total proceeds from the sale of its 50% stake in Texas Critical Data Centers LLC to US$74mm |
| 2026-04-08 | Applied Digital Corp. | Debt Financing | 2,150 | 200 | Applied Digital completes $2.15bn 6.750% senior secured notes due 2031 to fund the 200 MW Polaris Forge 2 hyperscaler campus in Harwood, ND, breaks ground on the 430 MW / 300 MW-IT Delta Forge 1 campus, and secures $100mm Macquarie DevCo facility plus CoreWeave lease credit enhancements |
| 2026-04-02 | Soluna Holdings, Inc | Acquisition | 53 | 150 | Soluna closes $53mm acquisition of 150 MW Briscoe Wind Farm in West Texas that powers its Project Dorothy data center campus, enabling planned 300 MW+ Dorothy 3 AI campus |
| 2026-03-31 | CoreWeave, Inc. | Debt Financing | 8,500 | — | CoreWeave subsidiary enters $8.5 billion delayed-draw credit facility led by Morgan Stanley and MUFG to fund GPU infrastructure at data center sites under a customer master services agreement |
| 2026-03-30 | Fermi Inc. | Lease | 1,800 | 200 | Fermi America FY2025 letter: ~$1.8bn raised (incl. $785mm IPO and $500mm MUFG turbine loan) for the ~6 GW-permitted Project Matador AI energy campus in Carson County, TX; 20-year powered-shell lease LOI with investment-grade tenant remains in place after $150mm advance-in-aid-of-construction agreement was terminated |
| 2026-03-27 | BlockchAIn Digital Infrastructure, Inc. | Lease | 500 | 25 | BlockchAIn shareholder letter: non-binding LOIs for a 20 MW build-to-suit data center lease with a global cloud provider (>$400mm) and a 5 MW AI deployment with an international PE firm (>$100mm), on top of its existing 40 MW South Carolina campus |
| 2026-03-24 | Edgemode, Inc. | Joint Venture | — | 4,350 | Edgemode amends its AI data center JV with Blackberry AIF (Spain), converting 400mm stock options into issued shares and confirming an expanded 4,350 MW Spanish development pipeline |
| 2026-03-17 | New ERA Energy & Digital, Inc. | Development Agreement | 70 | 200 | New Era Energy & Digital progresses 200 MW Phase 1 of its 1+ GW behind-the-meter gas-powered Texas Critical Data Center campus in Ector County toward FID and Q2 2026 construction start, following $70mm membership interest purchase from SharonAI |
| 2026-03-17 | Energy Vault Holdings, Inc. | Development Agreement | — | 25 | Energy Vault Q4 2025 results: strategic framework with Crusoe for phased deployment of up to 25 MW of Spark modular AI data centers at Energy Vault's Snyder, Texas technology center, plus ~500 acres of powered land secured in the US Southwest |
| 2026-03-17 | 1606 CORP. | Land Acquisition | 11 | — | 1606 Corp signs purchase and sale agreement to acquire a 132-acre data-center-ready property with existing on-site power generation in Lufkin, Texas for ~$11.2mm |
| 2026-03-13 | Jet.AI Inc. | Joint Venture | — | 50 | Jet.AI FY2025 results recap a planned JV for a 50 MW data center campus in Moapa, Clark County, Nevada and milestone progress on Canadian hyperscale campus JVs (385-acre Winnipeg, Manitoba site and Maritimes) |
| 2026-03-13 | Signing Day Sports, Inc. | Lease | 100 | 5 | BlockchAIn LLC (merging with Signing Day Sports) signs non-binding LOI with an international private equity firm for a 5 MW build-to-suit AI data center lease worth over $100mm in TCV over a 10-year initial term |
| 2026-03-09 | Signing Day Sports, Inc. | SPAC Merger | — | 40 | Signing Day Sports' pending reverse merger with BlockchAIn (40 MW AI/HPC data center in South Carolina) highlighted alongside BlockchAIn's electrical-equipment collaboration with PDM supporting a 5-6 GW modular data center pipeline |
| 2026-03-05 | Blue Owl Digital Infrastructure Trust | Debt Financing | — | — | Stack Infrastructure Issuer, LLC enters Ninth Amendment to its Secured Data Center Revenue Notes indenture (ABS program backed by nine Stack data center asset entities), filed by Blue Owl Digital Infrastructure Trust |
| 2026-03-02 | Core Scientific, Inc./tx | Land Acquisition | — | 285 | Core Scientific agrees to acquire an LLC owning ~265 acres in Hunt County, Texas with ~430 MW ERCOT-approved gross capacity (~285 MW leasable), adds ~300 MW gross at Dalton and Pecos, and has energized ~350 MW toward its ~590 MW CoreWeave commitment |
| 2026-03-02 | Digi Power X Inc. | Development Agreement | — | 10 | Digi Power X commissions first ARMS 200 modular Tier 3 AI data center in Alabama targeting 10 MW by Q3 2026, and extends due diligence on LOI with Omnis Pleasants for up to 1.3 GW power and 200-acre lease at Pleasants Power Station, West Virginia |
| 2026-03-02 | Riot Platforms, Inc. | Lease | — | — | Riot Platforms reports first phase of its Rockdale, Texas data center lease with AMD operational and generating revenue as of January 2026 |
| 2026-02-27 | EQUINIX INC | Acquisition | 4,000 | 800 | CPP Investments (~60%) and Equinix (~40%) agree to acquire Nordic data center operator atNorth from Partners Group at a US$4bn enterprise value, with a provisionally agreed $4.2bn financing package |
| 2026-02-26 | MARA Holdings, Inc. | Development Agreement | — | 1,000 | MARA signs Strategic Agreement with Starwood Capital Group / Starwood Digital Ventures to convert MARA's US bitcoin mining sites into hyperscale data centers via property-level JVs, targeting ~1 GW near-term IT capacity with pathway to 2.5+ GW |
| 2026-02-26 | PLUG POWER INC | Sale/Divestiture | 132 | — | Plug Power signs definitive agreement to sell its Project Gateway site in New York (land, infrastructure and substation assets at the STAMP industrial park) to Stream Data Centers for at least $132.5 million |
| 2026-02-26 | TERAWULF INC. | Lease | 12,800 | 522 | TeraWulf reports 522 critical IT MW of long-term HPC leases (~$12.8bn contracted revenue) with Core42 and Fluidstack/Google at Lake Mariner and the 168 MW Abernathy JV, plus $6.5bn of committed capital including $1.3bn Abernathy senior secured notes |
| 2026-02-26 | ORMAT TECHNOLOGIES, INC. | Power Purchase Agreement | — | 150 | Ormat signs 15-year geothermal portfolio PPA of up to 150 MW to supply Google's data centers through NV Energy, plus a 20-year ~13 MW PPA with Switch from the Salt Wells plant (disclosed in Q4 2025 earnings release) |
| 2026-02-26 | MARA Holdings, Inc. | Joint Venture | — | 1,000 | MARA Q4 2025 shareholder letter details Starwood Digital Ventures JV to develop >1 GW of AI/HPC IT capacity at MARA's power-rich sites (roadmap to 2.5+ GW), plus a 42 MW Nebraska data center acquisition and 64% Exaion stake |
| 2026-02-25 | Hut 8 Corp. | Lease | 7,000 | 245 | Hut 8 signs 15-year, $7.0bn lease with Fluidstack for 245 MW of IT capacity at its River Bend campus in Louisiana, financially backstopped by Google, under a partnership with Anthropic and Fluidstack for at least 245 MW and up to 2,295 MW of AI data center infrastructure |
| 2026-02-24 | Cipher Digital Inc. | Lease | 5,500 | 300 | Cipher Digital signs 15-year, 300 MW (gross) HPC lease with AWS at Black Pearl (~$5.5bn contracted revenue, Amazon.com guarantee), upsizes its 10-year Fluidstack/Google lease at Barber Lake to 300 MW (~$3.8bn), and raises $3.73bn of project-level high-yield notes; sells 49% JV mining stakes to Canaan for ~$40mm |
| 2026-02-05 | DIGITAL REALTY TRUST, INC. | Joint Venture | 427 | — | Digital Realty contributes an additional 40% interest in five operating data centers to its DC Partners NA Fund for ~$427mm, forms MedOne JV for an 18 MW campus in Petah Tikvah, Israel, and agrees to acquire TelcoHub 1 data center in Cyberjaya, Malaysia |
| 2026-02-05 | IREN Ltd | Debt Financing | 3,600 | 1,600 | IREN secures $3.6bn GPU financing at <6% for its Microsoft contract and announces a new 1.6 GW grid-connected data center campus in Oklahoma, lifting secured power to >4.5 GW |
| 2026-02-03 | Galaxy Digital Inc. | Power/Interconnection Agreement | — | 526 | Galaxy receives ERCOT approval for an additional 830 MW at its Helios campus (total approved >1.6 GW) and remains on track to deliver 133 MW critical IT to CoreWeave in 1H 2026 under Phase I of 800 MW of executed long-term leases |
| 2026-02-02 | CENTURY ALUMINUM CO | Sale/Divestiture | 200 | — | Century Aluminum sells ~750-acre Hawesville, KY smelter site to Justified DataPower for $200mm cash plus 6.8% minority stake in Raylan Data Holdings, which will develop an HPC/AI data center on the property |
| 2026-01-29 | Liberty Energy Inc. | Power/Interconnection Agreement | — | 400 | Liberty Energy (via Liberty Power Innovations) announces 1 GW on-site power development agreement with Vantage Data Centers anchored by a firm 400 MW reservation for delivery in 2027, plus a 330 MW power reservation and preliminary ESA with another data center developer for a Texas site expansion |
| 2026-01-28 | Edgemode, Inc. | Joint Venture | 11 | 3,550 | Edgemode enters 50.1/49.9 joint venture with Blackberry AIF (DC Estate Solutions Cayman) to develop eight HPC data center sites totaling 3,550 MW in Spain and Panama, funding a minimum $11.15 million to BAIF |
| 2026-01-20 | New ERA Energy & Digital, Inc. | Joint Venture | — | 1,000 | New Era Energy & Digital partners with Primary Digital Infrastructure as lead capital partner and co-sponsor to co-develop the 1+ GW Texas Critical Data Centers (TCDC) hyperscale campus in Ector County, Texas |
| 2026-01-15 | Galaxy Digital Inc. | Other | — | 830 | Galaxy secures ERCOT approval and AEP Texas service agreement for an additional 830 MW at its Helios data center campus in West Texas, lifting approved capacity to over 1.6 GW |
| 2026-01-07 | Applied Digital Corp. | Lease | 5,000 | 200 | Applied Digital signs ~15-year, 200 MW lease with a U.S. investment-grade hyperscaler at Polaris Forge 2 (Harwood, ND) worth ~$5bn, brings the first 100 MW building at Polaris Forge 1 online for CoreWeave, and closes $2.35bn 9.25% senior secured notes |
| 2025-12-22 | Applied Digital Corp. | Debt Financing | 100 | — | Applied Digital subsidiary APLD DevCo closes $100mm pre-lease development loan facility with Macquarie to fund new hyperscale AI factory campuses for an investment-grade hyperscaler under an October 2025 exclusivity agreement |
| 2025-12-11 | Galaxy Digital Inc. | Lease | 4,500 | 526 | Galaxy Digital details 15-year CoreWeave leases for 526 MW critical IT load (800 MW gross) at its Helios data center campus in Texas, with ~$4.5B Phase I lease payments and a $1.4B Deutsche Bank construction loan |
| 2025-11-25 | New ERA Energy & Digital, Inc. | Acquisition | — | — | Texas Critical Data Centers, New Era's 50/50 JV with Sharon AI, signs definitive purchase agreement for an additional 203 contiguous acres near Odessa, Texas, expanding the planned multi-gigawatt AI/HPC campus to 438 acres |
| 2025-11-20 | Applied Digital Corp. | Debt Financing | 2,350 | — | Applied Digital subsidiaries APLD ComputeCo LLC and APLD HPC Holdings 2 LLC issue $2.35bn of 9.250% senior secured notes due 2030 to finance the ELN-02 and ELN-03 data centers in Ellendale, North Dakota leased to CoreWeave |
| 2025-11-20 | Cipher Mining Inc. | Lease | 830 | 39 | Cipher Mining amends Barber Lake lease with Fluidstack to add 39 MW critical IT (56 MW gross) in a 10-year, ~$830 million Phase II expansion, with Google backstopping an additional $333 million and Cipher issuing $333 million add-on 7.125% senior secured notes |
| 2025-11-19 | Blue Acquisition Corp/Cayman | SPAC Merger | 450 | 85 | Blue Acquisition Corp proposes SPAC merger with Blockfusion USA at $450mm pre-money equity value to fund HPC/AI conversion of its 106 MW Niagara Falls, NY data center campus (50 MW energized), raising ~$200mm via trust and PIPE |
| 2025-11-17 | Soluna Holdings, Inc | Debt Financing | 100 | 35 | Soluna Q3 2025 results recap closing of a $100mm Generate Capital credit facility, $20mm Spring Lane Capital funding for the first 35 MW of wind-powered Project Kati 1 in Texas, and Galaxy Digital's planned 48 MW hosting deployment at Kati 1 |
| 2025-11-13 | Cipher Mining Inc. | Debt Financing | 1,400 | — | Cipher Compute LLC issues $1.4 billion of 7.125% senior secured notes due 2030 to finance the Barber Lake data center in Colorado City, Texas leased to Fluidstack with Google financial support |
| 2025-11-12 | Edgemode, Inc. | Joint Venture | 0 | 1,800 | Edgemode forms 75/25 SPV with Blackberry AIF that acquires five 100-hectare land leases in Spain to develop up to 1.8 GW of gas-powered HPC/AI data center sites for sale on a ready-to-build basis |
| 2025-11-12 | Applied Digital Corp. | Equity Financing | 788 | 200 | Applied Digital to draw additional $787.5 million of perpetual preferred equity from Macquarie Asset Management for Polaris Forge 1 (400 MW, Ellendale) and Polaris Forge 2 (200 MW leased, Harwood) AI Factory campuses in North Dakota, plus $65 million revolver from First National Bank of Omaha |
| 2025-11-12 | Rumble Inc. | Acquisition | — | — | Rumble signs transaction support agreements with Tether (65.2% holder), ART Holding/Aroosh Thillainathan and Apeiron to acquire their Northern Data AG shares in an all-stock deal alongside a tender offer for the remaining shares, acquiring Northern Data's HPC data center business (20,320 H100 and 2,032 H200 GPUs) after its Peak Mining bitcoin business was sold to Highland Group Mining |
| 2025-11-10 | Fermi Inc. | Lease | 150 | 1,000 | Fermi America executes $150mm Advance in Aid of Construction agreement with investment-grade prospective tenant under LOI to lease >1 GW of powered shell across 12 facilities at Project Matador, Texas Panhandle |
| 2025-11-10 | Babcock & Wilcox Enterprises, Inc. | Other | 1,500 | 1,000 | Babcock & Wilcox receives limited notice to proceed on $1.5B project to design and install 4x300 MW natural gas-fired boilers and steam turbines delivering 1 GW of on-site power for Applied Digital's AI Factory |
| 2025-11-10 | TERAWULF INC. | Lease | 6,700 | 450 | TeraWulf Q3 2025 results: >520 MW of long-term HPC leases signed at Lake Mariner (450 MW Fluidstack/Google-backed, 72.5 MW Core42), 240 MW Abernathy JV in Texas with Fluidstack and Google, and >$5bn of financings |
| 2025-11-06 | Soluna Holdings, Inc | Hosting/Colocation Agreement | — | 3 | Soluna monthly update: 3.3 MW hosting partnership with KULR Technology at Project Sophie (Texas), MOU with an HPC development partner for the 83 MW Project Kati 2 AI site, and 50-acre land acquisition adjacent to Project Kati 1 |
| 2025-11-06 | IREN Ltd | Hosting/Colocation Agreement | 9,700 | 200 | IREN secures $9.7bn AI cloud contract with Microsoft, to be served from Horizon 1-4 liquid-cooled data centers (200 MW critical IT) at its 750 MW Childress, Texas campus |
| 2025-11-04 | New ERA Energy & Digital, Inc. | Joint Venture | — | 1,000 | New Era Energy & Digital investor deck details Texas Critical Data Centers, its 50/50 JV with Sharon AI for a 1 GW+ on-site gas-powered AI data center campus on 235 acres in Ector County, Texas, targeting first power early 2027 |
| 2025-11-04 | Babcock & Wilcox Enterprises, Inc. | Development Agreement | 1,500 | 1,000 | Babcock & Wilcox signs limited notice to proceed with Applied Digital on a >$1.5 billion contract to design and install four 300 MW natural gas-fired boiler/steam turbine plants delivering 1 GW of power for an Applied Digital AI Factory |
| 2025-11-04 | MARA Holdings, Inc. | Joint Venture | 168 | 400 | MARA announces joint initiative with MPLX to develop ~400 MW (expandable to 1.5 GW across three sites) of gas-fired integrated power generation and data center campuses in West Texas, and reports pending ~$168mm acquisition of a ~64% stake in EDF's HPC data center subsidiary Exaion |
| 2025-11-03 | IREN Ltd | Other | 9,700 | 200 | IREN signs $9.7 billion, 5-year AI cloud contract with Microsoft for 200 MW (IT load) of NVIDIA GB300 GPU capacity at IREN-owned data centers in Childress, Texas |
| 2025-11-03 | Cipher Mining Inc. | Lease | 5,500 | 300 | Cipher Mining signs ~$5.5bn, 15-year lease with Amazon Web Services for 300 MW gross of turnkey AI data center capacity delivered in 2026, and forms ~95%-owned JV to develop 1 GW Colchis site in West Texas backed by an AEP Direct Connect Agreement |
| 2025-10-30 | Riot Platforms, Inc. | Land Acquisition | 40 | 112 | Riot Platforms contracts to buy a 67-acre parcel adjacent to its Corsicana, Texas site for $40mm and initiates core & shell development of the first two 56 MW data center buildings (112 MW critical IT) on the 1 GW campus |
| 2025-10-30 | DigitalBridge Group, Inc. | Lease | 40,000 | 2,400 | DigitalBridge Q3 2025: Vantage Data Centers contracts $40bn of AI infrastructure at Frontier (TX, 1.4 GW, $25bn) and Lighthouse (WI, ~1.0 GW, $15bn) mega-campuses supporting Oracle/OpenAI Stargate; record 2.6 GW leased |
| 2025-10-29 | CLEANSPARK, INC. | Acquisition | — | 285 | CleanSpark acquires rights to ~271 acres in Austin County, Texas and executes long-term power supply agreements totaling 285 MW for a new AI data center campus in the Greater Houston area |
| 2025-10-29 | ProPetro Holding Corp. | Power/Interconnection Agreement | — | 60 | ProPetro's PROPWR unit secures long-term contract to supply ~60 MW of on-site power capacity to a hyperscaler data center in the Midwest U.S., its first data center power contract |
| 2025-10-29 | EQUINIX INC | Land Acquisition | — | 900 | Equinix Q3 2025 results: closed land acquisitions in Amsterdam, Chicago, Johannesburg, London and Toronto supporting 900+ MW of retail and xScale capacity, bringing developable capacity to ~3 GW, plus new Dallas 12 (67 MW) and Chennai ($69mm) developments |
| 2025-10-28 | TERAWULF INC. | Joint Venture | 9,500 | 168 | TeraWulf forms 51%-owned joint venture with Fluidstack to develop a 168 MW critical IT HPC campus in Abernathy, Texas under a 25-year, ~$9.5bn lease backstopped by Google for $1.3bn |
| 2025-10-27 | ProPetro Holding Corp. | Power/Interconnection Agreement | — | 60 | ProPetro's PROPWR signs long-term 60 MW hybrid gas-plus-BESS power supply contract for a hyperscaler data center in the U.S. Midwest, operations beginning Q2 2026 |
| 2025-10-23 | DIGITAL REALTY TRUST, INC. | Sale/Divestiture | 90 | — | Digital Realty sells non-core data centers in Atlanta, Boston and Miami for ~$90mm and acquires Los Angeles land for ~$49mm (32 MW) plus Chicago Franklin Park parcels for ~$18mm (40+ MW) |
| 2025-10-21 | Roth CH Acquisition Co. | SPAC Merger | — | 1,000 | Roth CH Acquisition investor deck for its SPAC merger with Sharon AI, whose 50/50 JV with New Era Energy & Digital (Texas Critical Data Centers LLC) is developing an up-to-1 GW behind-the-meter gas-powered AI data center campus on 235 acres in Ector County, Texas |
| 2025-10-09 | Applied Digital Corp. | Equity Financing | 450 | — | Applied Digital amends and restates unit purchase agreement with Macquarie's MIP HPC Holdings for up to $450 million of preferred equity in APLD HPC TopCo 2 to fund the Polaris Forge 1 (Ellendale, ND) campus leased to CoreWeave |
| 2025-10-09 | Applied Digital Corp. | Lease | 11,000 | 150 | Applied Digital signs additional 150 MW ~15-year lease with CoreWeave, fully leasing the 400 MW Polaris Forge 1 campus in Ellendale, ND for ~$11bn of total contracted lease revenue, and breaks ground on the $3bn Polaris Forge 2 campus with Macquarie financing |
| 2025-09-11 | Soluna Holdings, Inc | Hosting/Colocation Agreement | — | 83 | Soluna breaks ground on 166 MW wind-powered Project Kati in Willacy County, Texas, with 83 MW Kati 1 bitcoin hosting phase (48 MW for Galaxy) online early 2026 and 83 MW Kati 2 AI/HPC phase to follow |
| 2025-09-09 | Talen Energy Corp | Power Purchase Agreement | — | 1,920 | Talen investor update highlights AWS nuclear PPA ramp (240 MW mid-2026 to up to 1,920 MW) from Susquehanna and pending ~3 GW Freedom and Guernsey CCGT acquisitions in PA/OH data center markets |
| 2025-08-29 | Applied Digital Corp. | Lease | 4,000 | 150 | Applied Digital finalizes additional 150 MW critical IT lease with CoreWeave at Polaris Forge 1 in Ellendale, ND, bringing total CoreWeave leases to 400 MW and total contracted lease revenue to ~$11bn |
| 2025-08-18 | TERAWULF INC. | Lease | — | 160 | TeraWulf subsidiary Akela Data signs 10-year lease of 160+ MW colocation building CB-5 at Lake Mariner campus to Fluidstack, backstopped by Google in exchange for warrants on 32.6mm TeraWulf shares |
| 2025-08-14 | TERAWULF INC. | Lease | — | 200 | TeraWulf subsidiary Akela Data signs two 10-year data center leases (CB-3, CB-4) with Fluidstack for 200+ MW of critical IT load at Lake Mariner, NY, backstopped by Google in exchange for 41mm penny warrants |
| 2025-08-14 | TERAWULF INC. | Lease | 3,700 | 200 | TeraWulf signs 10-year, ~$3.7bn hyperscale lease with Fluidstack for 200+ MW critical IT (250 MW gross) at Lake Mariner (CB-3 and CB-4) with $1.8bn Google backstop, and secures 80-year Cayuga site lease unlocking 400 MW of HPC capacity in Lansing, NY |
| 2025-08-07 | DigitalBridge Group, Inc. | Acquisition | — | 400 | DigitalBridge closes multi-billion-dollar acquisition of Yondr Group (400 MW+ in place, 1 GW+ potential) and launches Takanock powered-land platform with ArcLight ($500mm committed) while portfolio companies Switch and Vantage raise $7bn+ of debt in 2Q25 |
| 2025-08-07 | Hut 8 Corp. | Hosting/Colocation Agreement | — | 205 | Hut 8 energizes and commercializes its 205 MW Vega site for ASIC colocation with BITMAIN (with American Bitcoin purchase option), secures 5-year IESO capacity contracts for 310 MW of Ontario generation via Far North JV with Macquarie, and advances 430 MW of AI data center projects including River Bend, Louisiana |
| 2025-08-07 | Cipher Mining Inc. | Debt Financing | 172 | 150 | Cipher Mining Q2 2025 update: energized 150 MW Black Pearl Phase I (of 300 MW site) funded by a $172.5mm convertible note offering, plans 150 MW HPC-convertible Phase II, and reports Barber Lake (300 MW approved, signed MOU for additional 500 MW) in advanced HPC tenant discussions |
| 2025-08-07 | Talen Energy Corp | Power Purchase Agreement | — | 1,920 | Talen expands AWS PPA to up to 1,920 MW of front-of-the-meter nuclear power through 2042 for AWS data center campus adjacent to Susquehanna, and agrees to acquire Freedom and Guernsey gas plants for $3.5bn net |
| 2025-08-05 | Galaxy Digital Inc. | Lease | — | 133 | CoreWeave exercises final option for an additional 133 MW of critical IT load at Galaxy's Helios campus, bringing its commitment to the full 800 MW gross / 526 MW critical IT approved at the site; Galaxy also signs PSA to buy 160 adjacent acres with a 1 GW interconnection request |
| 2025-07-31 | EQUINIX INC | Acquisition | — | — | Equinix re-files Q2 2025 earnings release (corrected cash flow statement showing $182mm business acquisitions): completed acquisition of three data centers in Manila, Philippines in June; 12 xScale projects underway with ~$450mm xScale spend to be reimbursed via U.S. JV |
| 2025-07-30 | EQUINIX INC | Acquisition | — | — | Equinix Q2 2025 results: completed acquisition of three data centers in Manila, Philippines in June; 59 major projects underway including 12 xScale projects, with ~$450mm of on-balance-sheet xScale spend to be reimbursed on transfer into U.S. joint venture |
| 2025-07-29 | NEW ERA HELIUM INC. | Acquisition | — | 250 | New Era Helium's 50/50 JV Texas Critical Data Centers closes purchase of 235 acres from Grow Odessa in Ector County, TX for a 250 MW AI/HPC campus, with an LOI for 203 more acres |
| 2025-07-29 | BLUSKY AI INC. | Land Acquisition | — | 50 | BluSky AI signs non-binding LOI with Creekstone Energy to acquire 25 acres with up to 50 MW of power at Creekstone's Delta Data Center Development (Delta Gigasite) in Utah for modular SkyMod AI data centers |
| 2025-07-24 | DIGITAL REALTY TRUST, INC. | Equity Financing | 3,000 | — | Digital Realty's U.S. Hyperscale Data Center Fund tops $3bn in LP equity commitments; DLR contributes five operating data centers and two development sites for $900mm+ gross proceeds and buys land in Atlanta (200 MW) and Dallas (480 MW) |
| 2025-07-17 | PPL Corp | Joint Venture | — | — | PPL and Blackstone Infrastructure form 51/49 joint venture to build, own and operate gas-fired combined-cycle generation in Pennsylvania to power data centers under long-term energy services agreements |
| 2025-07-10 | Soluna Holdings, Inc | Hosting/Colocation Agreement | 20 | 48 | Soluna completes hosting expansion contracts fully contracting the 48 MW Project Dorothy 2 data center (30 MW customer expansion, Compass Mining 13 MW, Blockware 8 MW) and secures $20M from Spring Lane Capital for Project Kati 1 |
| 2025-07-03 | IREN Ltd | Other | 130 | 50 | IREN purchases 2.4k NVIDIA Blackwell B200/B300 GPUs for ~$130mm to deploy at its 50 MW Prince George, BC data center, lifting AI Cloud fleet to ~4.3k GPUs |
| 2025-07-02 | Jet.AI Inc. | Joint Venture | 20 | 500 | Jet.AI forms Convergence Compute joint venture with Consensus Core to develop hyperscale data center projects in Manitoba and Maritime Canada, committing up to $20 million in five milestone tranches |
| 2025-06-25 | Bit Digital, Inc | Debt Financing | 44 | — | Bit Digital's WhiteFiber/Enovum secures ~$43.9 million RBC credit facility to refinance buildout of MTL-2 Tier-3 AI data center in Pointe-Claire, Quebec |
| 2025-06-25 | SONIM TECHNOLOGIES INC | Other | 300 | — | Sonim signs non-binding LOI for reverse takeover by an unnamed private US HPC 'AI factory' operator valued at ~$300 million, with Sonim holders retaining $17.5 million of equity |
| 2025-06-10 | Hyperscale Data, Inc. | Hosting/Colocation Agreement | — | 20 | Hyperscale Data subsidiary Sentinum signs hosting services agreement with Montana OP LLC for ~20 MW of capacity at a Montana data center to deploy ~6,800 S19j Pro bitcoin miners with grid curtailment revenue sharing |
| 2025-06-02 | Applied Digital Corp. | Lease | 7,000 | 250 | Applied Digital signs two ~15-year leases with CoreWeave for 250 MW of AI/HPC capacity at its Ellendale, North Dakota campus, worth ~$7 billion in total revenue |
| 2025-05-23 | Bit Digital, Inc | Acquisition | 45 | 99 | Bit Digital's WhiteFiber/Enovum subsidiary closes $45 million acquisition of a Unifi industrial building in Madison, North Carolina for conversion to an HPC data center with up to 99 MW of Duke Energy power |
| 2025-05-21 | UNIFI INC | Sale/Divestiture | 45 | 99 | Unifi Manufacturing closes sale of North Carolina industrial property to Enovum Data Centers affiliate for $45 million plus power-capacity earnouts, for conversion to a data center |
| 2025-05-19 | DUOS TECHNOLOGIES GROUP, INC. | Other | — | — | Duos Technologies Q1 2025 call: customer commitments for eight additional Edge Data Centers across Texas (target 15 by YE2025) and 570 MW of APR Energy gas turbines contracted, including behind-the-meter power for two U.S. data centers and a planned Pampa, TX data center park |
| 2025-05-13 | Galaxy Digital Inc. | Lease | — | 260 | CoreWeave exercises Phase II option for ~260 MW of incremental critical IT load at Galaxy's Helios data center campus, lifting total committed capacity to ~393 MW |
| 2025-05-08 | Hut 8 Corp. | Land Acquisition | — | 205 | Hut 8 Q1 2025 results: 205 MW Vega data center on track for Q2 2025 energization, 592 acres secured at River Bend campus in Louisiana, and launch of American Bitcoin subsidiary |
| 2025-05-06 | Cipher Mining Inc. | Joint Venture | — | 300 | Cipher Mining signs joint venture term sheet with Fortress to finance its 300 MW Barber Lake HPC data center site in Colorado City, Texas, alongside 300 MW Black Pearl energization |
| 2025-05-01 | Riot Platforms, Inc. | Acquisition | 185 | — | Riot subsidiary Whinstone US acquires Rhodium's equipment and property at the Rockdale, TX data center out of Chapter 11 for $185mm ($136mm cash + $49mm Riot stock), settling litigation and terminating Rhodium hosting agreements |
| 2025-04-24 | DIGITAL REALTY TRUST, INC. | Equity Financing | 2,500 | — | Digital Realty launches U.S. Hyperscale Data Center Fund targeting ~$2.5bn of LP equity (>$1.7bn subscribed) to hold five operating hyperscale data centers and four development land sites, and enters Indonesia via 50% stake in Digital Realty Bersama JV for ~$95mm |
| 2025-04-15 | Soluna Holdings, Inc | Land Acquisition | — | 166 | Soluna signs definitive agreements to secure two land parcels in Willacy County, Texas for its 166 MW Project Kati Bitcoin hosting and AI data center site |
| 2025-04-08 | Edgemode, Inc. | Acquisition | — | 95 | Edgemode closes share exchange acquiring 100% of Synthesis Analytics Production Ltd (SAPL), gaining a 95 MW grid-access/power purchase agreement, building lease and land in Marviken, Sweden for planned 20 MW and 75 MW HPC colocation data centers |
| 2025-04-02 | DUOS TECHNOLOGIES GROUP, INC. | Power/Interconnection Agreement | — | 300 | Duos reports closing of APR Energy/Fortress asset management agreement (~$42mm over 2 years) and deployment of 300 MW of APR gas turbines behind-the-meter for an unnamed large US AI data center operator; first Edge Data Center commercialized in Amarillo, TX with Pampa, TX sites next |
| 2025-03-31 | Hut 8 Corp. | Joint Venture | — | — | Hut 8 contributes substantially all its ASIC miners to American Data Centers Inc. (renamed American Bitcoin) for an 80% stake and becomes its exclusive ASIC colocation and managed services provider |
| 2025-03-26 | Mawson Infrastructure Group Inc. | Hosting/Colocation Agreement | — | — | Mawson Hosting signs a 3-year profit-share Master Colocation Agreement to host Canaan Inc.'s bitcoin-mining ASICs at a Mawson data center facility in the PJM region |
| 2025-03-11 | Soluna Holdings, Inc | Hosting/Colocation Agreement | — | 6 | Soluna monthly update: Project Kati (166 MW) exits ERCOT planning phase, 5.5 MW Bit Digital hosting expansion at Project Dorothy, and Project Rosa land purchase agreement securing up to 187 MW |
| 2025-02-28 | TERAWULF INC. | Lease | 1,000 | 72 | TeraWulf signs long-term data center leases with Core42 for 72.5 MW of HPC hosting capacity at Lake Mariner, New York, expected to generate $1bn cumulative revenue over initial 10-year terms with a 135 MW expansion option |
| 2025-02-27 | Core Scientific, Inc./tx | Hosting/Colocation Agreement | 1,200 | 70 | Core Scientific signs $1.2bn, 70 MW critical IT HPC hosting expansion with CoreWeave at Denton, Texas, taking the site to ~260 MW and CoreWeave's total contracted capacity to ~590 MW across six sites |
| 2025-02-27 | NEW ERA HELIUM INC. | Land Acquisition | — | 250 | New Era Helium / Sharon AI JV Texas Critical Data Centers signs LOI with GROW Odessa to acquire 200 acres in Ector County, Texas for a 250 MW net-zero, behind-the-meter gas-powered AI/HPC data center |
| 2025-02-26 | MARA Holdings, Inc. | Acquisition | — | 240 | MARA Q4/FY2024 shareholder letter: acquires a Hansford County, Texas wind farm (240 MW interconnection, 114 MW nameplate) to power mining behind the meter, closed Q1 2025; recaps 2024 purchases of five owned data centers (Granbury/Kearney 390 MW, Garden City 200 MW, Ohio 222 MW) totaling ~1.2 GW |
| 2025-02-25 | Cipher Mining Inc. | Development Agreement | — | 500 | Cipher Mining signs MOU for an additional 500 MW data center at Barber Lake, acquires 337 adjacent acres, and closes acquisition of the 100 MW Stingray site in Andrews County, Texas |
| 2025-02-21 | Solaris Energy Infrastructure, Inc. | Power/Interconnection Agreement | — | 500 | Solaris Energy Infrastructure signs six-year contract for a minimum 500 MW of behind-the-meter gas-turbine power to support construction of a new data center, with a 50.1%/49.9% JV with the customer to co-own the power equipment |
| 2025-02-20 | Jet.AI Inc. | Development Agreement | — | 50 | Jet.AI pivots to AI data center development, signing an LOI for a first 50 MW project on a 120-acre campus with phased build-out toward 1 GW, alongside all-stock sale of its aviation assets to flyExclusive |
| 2025-02-20 | Soluna Holdings, Inc | Power/Interconnection Agreement | — | 166 | Soluna's 166 MW Project Kati exits ERCOT planning phase, clearing path to construction of two-phase Texas Bitcoin hosting / AI data center co-located with EDF Renewables-Masdar wind farm |
| 2025-02-13 | DIGITAL REALTY TRUST, INC. | Joint Venture | 7,000 | — | Digital Realty and Blackstone close second phase of their $7bn hyperscale data center development JV (Frankfurt and Northern Virginia); DLR also buys 156 acres in Charlotte, NC for $160mm (400 MW) and sells further Frankfurt stake to Digital Core REIT |
| 2025-02-12 | EQUINIX INC | Lease | — | 31 | Equinix Q4 2024 earnings release: xScale JVs leased an incremental 31 MW at Paris 12 and Paris 13 (total xScale leasing >400 MW globally) and recaps the >$15bn US xScale JV with CPP Investments and GIC and a 20 MW Singapore 6 build |
| 2025-01-29 | Roth CH Acquisition Co. | SPAC Merger | — | — | Roth CH Acquisition Co. signs business combination agreement with Sharon AI, an AI/HPC GPU-as-a-Service provider operating in Tier IV colocation data centers and developing a 250 MW net-zero data center JV in the Permian Basin, Texas |
| 2025-01-21 | NEW ERA HELIUM INC. | Joint Venture | — | 250 | New Era Helium and Sharon AI sign LLC Agreement forming 50/50 joint venture Texas Critical Data Centers LLC to build a 250 MW net-zero gas-fired power plant and data center in the Permian Basin |
| 2025-01-14 | Applied Digital Corp. | Equity Financing | 900 | 100 | Applied Digital signs Unit Purchase Agreement with Macquarie Asset Management (MIP VI) for $225mm preferred equity at closing and up to $900mm total equity commitment into APLD HPC Holdings, owner of the 100 MW Ellendale, ND Building A HPC data center and Buildings B and C |
| 2025-01-10 | Gryphon Digital Mining, Inc. | Hosting/Colocation Agreement | — | — | Gryphon Digital Mining signs a 1-year Master Colocation Agreement with Mawson Hosting to colocate its mining servers at a Mawson data center facility in the PJM region |
| 2025-01-07 | HALLADOR ENERGY CO | Power Purchase Agreement | 5 | — | Hallador Power signs exclusive Conversion Transaction Commitment Agreement with an unnamed global data center developer to supply energy and capacity from its 1 GW Merom Generating Station (via a utility partner) to a potential data center in Indiana |
| 2025-01-06 | Bit Digital, Inc | Acquisition | 23 | 5 | Bit Digital (via Enovum Data Centers MTL II) acquires 160,000 sq ft Montreal-area building from an Alexandria Real Estate Equities subsidiary for CAD $33.5 million (~US$23.3 million) for a 5 MW Tier-3 build-to-suit data center (MTL2) |
| 2024-12-26 | TERAWULF INC. | Lease | — | 60 | TeraWulf signs 10-year data center lease with Core42 (G42 subsidiary) for 72.5 MW gross / 60 MW critical IT at Lake Mariner, New York, with option to expand by 135 MW gross / 108 MW IT |
| 2024-12-02 | Cartica Acquisition Corp | SPAC Merger | 4,184 | 42 | Cartica Acquisition Corp agrees to SPAC merger with Nidar Infrastructure (Yotta Data Services), India's Tier III/IV data center and NVIDIA cloud operator, at ~$4.2bn enterprise value with ~$475mm PIPE cash to fund expansion |
| 2024-11-25 | Core Scientific, Inc./tx | Power/Interconnection Agreement | — | 394 | Denton City Council approves amendments to Core Scientific's power purchase agreements and land leases, raising power access from 297 MW to 394 MW and leased land from 31 to 78 acres for HPC/GPU expansion |
| 2024-11-14 | Oklo Inc. | Power Purchase Agreement | — | 750 | Oklo receives non-binding LOIs for up to 750 MW of nuclear power for data center projects, including a 100 MW 20-year PPA LOI with Prometheus Hyperscale, lifting its customer pipeline to 2,100 MW |
| 2024-11-12 | MARA Holdings, Inc. | Acquisition | 60 | 122 | MARA acquires two operational bitcoin mining data centers in Hannibal and Hopedale, Ohio (222 MW interconnect-approved, 122 MW current) at $270,000/MW (~$60mm implied) and begins developing a 150 MW greenfield site in Findlay, Ohio |
| 2024-11-12 | TERAWULF INC. | Lease | 500 | 750 | TeraWulf signs expanded long-term Lake Mariner ground lease with exclusive rights to 750 MW of infrastructure capacity for HPC hosting, sells 25% Nautilus JV stake to Talen and raises $500mm convertible notes |
| 2024-11-12 | Roth CH Acquisition V Co. | Joint Venture | — | 90 | New Era Helium and Sharon AI sign non-binding LOI for 50/50 joint venture to build an initial 90 MW gas-fired power plant and Tier 3 AI data center in the Permian Basin |
| 2024-11-06 | Core Scientific, Inc./tx | Hosting/Colocation Agreement | 8,700 | 500 | Core Scientific Q3 2024 results: HPC hosting customer exercised options for an additional 232 MW (112 MW in Q3, 120 MW in Q4), bringing contracted critical IT load to ~500 MW with ~$8.7bn potential revenue over 12-year contracts; new 11 MW Alabama data center secured |
| 2024-11-04 | Talen Energy Corp | Power/Interconnection Agreement | — | 300 | FERC rejects amended Susquehanna ISA that would have raised co-located load for the AWS data center campus at Talen's Susquehanna nuclear plant from 300 MW to 480 MW; existing ISA still permits 300 MW and first phases proceed |
| 2024-10-31 | Cipher Mining Inc. | Land Acquisition | — | 300 | Cipher Mining closes acquisitions of 300 MW Barber Lake and 70 MW Reveille data center sites in Texas and signs options on three additional 500 MW sites |
| 2024-10-30 | EQUINIX INC | Joint Venture | 15,000 | — | Equinix agrees to form a greater-than-$15bn xScale joint venture with CPP Investments and GIC to build multi-hundred-megawatt hyperscale data center campuses across the U.S., nearly tripling xScale capital |
| 2024-10-28 | COPT DEFENSE PROPERTIES | Land Acquisition | — | — | COPT Defense acquires 365-acre land parcel near Des Moines, Iowa (3.3mm developable SF) to expand its hyperscale data center shell program to a new market |
| 2024-10-24 | DIGITAL REALTY TRUST, INC. | Acquisition | 200 | 15 | Digital Realty 3Q24 results disclose closed $200mm acquisition of two Slough (west London) data centers totaling 15 MW IT load, plus €43mm purchase of Amsterdam Schiphol Rijk land/shell (15 MW) and ~$15mm Richardson, TX parcel |
| 2024-10-23 | Core Scientific, Inc./tx | Hosting/Colocation Agreement | 2,000 | 120 | CoreWeave exercises final option with Core Scientific for ~120 MW of additional critical IT load under a 12-year HPC hosting contract, bringing total contracted capacity to ~500 MW at six sites and cumulative revenue to $8.7bn |
| 2024-10-03 | TERAWULF INC. | Sale/Divestiture | 92 | — | TeraWulf sells its 25% stake in the Nautilus Cryptomine JV to a Talen Energy subsidiary for ~$92mm ($85mm cash plus ~$7mm of miners) to fund HPC/AI buildout at Lake Mariner |
| 2024-09-16 | Soluna Holdings, Inc | Development Agreement | — | 187 | Soluna signs term sheets for power and land for Project Rosa, a 187 MW data center co-located with a 240 MW wind farm in Texas |
| 2024-09-05 | Talen Energy Corp | Power Purchase Agreement | 650 | 960 | Talen investor day details AWS arrangement: $650mm sale of the Cumulus Data campus plus Susquehanna nuclear PPA for up to 960 MW of direct-connect carbon-free power ramping 120 MW/yr on 10-year fixed-price terms, with FERC review of the ISA amendment to 480/960 MW pending |
| 2024-08-22 | Stronghold Digital Mining, Inc. | Acquisition | 125 | 307 | Bitfarms agrees to acquire Stronghold Digital Mining in an all-stock merger valued at ~$125mm ($6.02/share, 2.52 BITF shares per SDIG share), adding 165 MW of Pennsylvania generation and 142 MW of PJM import capacity with HPC/AI potential |
| 2024-08-16 | Soluna Holdings, Inc | Power Purchase Agreement | — | 166 | Soluna Q2 2024 results: signed definitive power purchase agreement with EDF Renewables for 166 MW two-phase Project Kati Texas data center co-located at EDF Renewables/Masdar wind facility |
| 2024-08-13 | Hut 8 Corp. | Equity Financing | 150 | 205 | Hut 8 Q2 2024 results: closed $150mm Coatue strategic investment to build AI infrastructure and announced new Texas Panhandle site with 205 MW of available power |
| 2024-08-13 | Oklo Inc. | Power Purchase Agreement | — | 100 | Oklo Q2 2024 update: non-binding LOI for a 20-year PPA to supply 100 MW of nuclear power to Wyoming Hyperscale's data center campus; 1,350 MW total in signed non-binding LOIs including 50 MW to Diamondback Energy and Equinix pre-agreement for up to 500 MW with $25mm pre-payment |
| 2024-08-13 | Cipher Mining Inc. | Land Acquisition | — | 70 | Cipher Mining Q2 2024 business update: on track to close Reveille site in Cotulla, Texas (70 MW approved, expandable to 200 MW) for HPC powered shell, plus 4 new North American sites with up to 1.7 GW for 2027-2028 energization |
| 2024-08-07 | Core Scientific, Inc./tx | Hosting/Colocation Agreement | 6,700 | 382 | Core Scientific contracts 382 MW of HPC hosting infrastructure with CoreWeave under 12-year agreements with ~$6.7bn total potential revenue; CoreWeave funds up to $575mm ($1.5mm/MW) of build-out; 16 MW Austin HPC site begins operations |
| 2024-08-07 | EQUINIX INC | Acquisition | 180 | — | Equinix Q2 2024 results: ~$180mm acquisition of three Philippines data centers from Total Information Management, formation of Americas xScale JV with SV12x contributed, 17 MW of new xScale leasing and >200-acre Atlanta campus land purchase |
| 2024-08-01 | CalEthos, Inc. | Development Agreement | — | 420 | CalEthos signs option agreement to purchase 315 acres in Lithium Valley (Imperial County, CA) for a planned clean-energy data center campus with a 420 MW first phase |
| 2024-08-01 | IRON MOUNTAIN INC | Lease | — | 66 | Iron Mountain leases 66 MW of data center capacity in Q2 2024 (97 MW in 1H), raising its full-year 2024 leasing projection to 130 MW; 305.5 MW under construction 96% pre-leased, led by Northern Virginia VA-3/VA-4/VA-5/VA-6/VA-7 |
| 2024-08-01 | AES CORP | Power Purchase Agreement | — | 2,200 | AES signs 2.2 GW of new agreements with data center hyperscalers: 1.2 GW of new data center load at its US utilities, 15-year PPAs for 727 MW of wind and solar for Texas data centers, and a 310 MW retail supply agreement for Ohio data centers |
| 2024-07-25 | DIGITAL REALTY TRUST, INC. | Joint Venture | 388 | — | Digital Realty sells 75% of a third stabilized Chicago hyperscale data center into its GI Partners JV for ~$388mm, sells additional 24.9% Frankfurt stake to Digital Core REIT for EUR117mm, and closes $200mm purchase of two Slough (west London) data centers totaling 15 MW |
| 2024-06-24 | Cartica Acquisition Corp | SPAC Merger | 4,200 | 33 | Cartica Acquisition Corp agrees to SPAC business combination with Nidar Infrastructure (Yotta), India's Tier III/IV AI data center and GPU cloud operator, at ~$4.2bn implied pro forma enterprise value with a $500mm PIPE |
| 2024-06-12 | Core Scientific, Inc./tx | Hosting/Colocation Agreement | 3,500 | 200 | Core Scientific investor day details definitive 12-year HPC hosting agreements with CoreWeave for ~200 MW of HPC capacity (~280 MW gross) worth ~$3.5bn cumulative revenue |
| 2024-05-22 | Soluna Holdings, Inc | Power Purchase Agreement | — | 166 | Soluna signs power purchase agreement with EDF Renewables and Masdar for Project Kati, a two-phase 166 MW wind-co-located data center in Texas; also discloses a $1mm equipment loan and up to $30mm Spring Lane commitment for Dorothy 2 |
| 2024-05-09 | CLEANSPARK, INC. | Acquisition | 19 | 75 | CleanSpark agrees to buy two Cheyenne, Wyoming bitcoin mining sites (75 MW, ~17 acres) from MineOne Wyoming Data Center for $18.75mm plus up to $13.75mm contingent on securing an additional 55 MW |
| 2024-05-08 | Core Scientific, Inc./tx | Hosting/Colocation Agreement | — | 16 | Core Scientific Q1 2024 results: delivered 16 MW of data center infrastructure to a high-performance compute hosting customer ahead of schedule and is in discussions to convert >500 MW of its 745 MW owned infrastructure to HPC hosting |
| 2024-05-08 | EQUINIX INC | Lease | — | 48 | Equinix Q1 2024 earnings release: pre-leased an incremental 48 MW of xScale capacity at Frankfurt 10 and Osaka 4/5, announced first US xScale JV with PGIM Real Estate (SV12x, Silicon Valley), purchased its Dublin 2, Mumbai 2 and Stockholm 3 IBX facilities, and signed its first Asia-Pacific renewable PPA in Australia |
| 2024-05-02 | DIGITAL REALTY TRUST, INC. | Sale/Divestiture | 388 | 48 | Digital Realty sells 75% interest in a stabilized Chicago hyperscale data center to GI Partners for ~$388mm (6.5% cap rate), forms JV with Mitsubishi Corp for two 48 MW build-to-suit Dallas data centers ($200mm for 65%), and sells additional 24.9% of Frankfurt facility to Digital Core REIT for ~$129mm |
| 2024-03-18 | MARATHON DIGITAL HOLDINGS, INC. | Acquisition | 87 | — | Marathon Digital agrees to acquire the Garden City, Texas data center it currently uses from Applied Digital subsidiary APLD - Rattlesnake Den I for ~$87.3mm, assuming the ground lease |
| 2024-03-12 | Core Scientific, Inc./tx | Hosting/Colocation Agreement | 100 | 16 | Core Scientific FY2023 earnings deck highlights HPC hosting contract with CoreWeave for up to 16 MW at its Austin, TX data center worth more than $100mm over a multi-year period |
| 2024-03-05 | TERAWULF INC. | Other | — | 50 | TeraWulf exercises option to add 50 MW at the Nautilus nuclear-powered facility in Pennsylvania (to 100 MW total) following Talen's sale of the adjacent Cumulus data center campus to Amazon Web Services |
| 2024-02-14 | EQUINIX INC | Lease | — | 90 | Equinix Q4 2023 earnings release reports record 90 MW of xScale hyperscale leasing across six assets in EMEA and APAC, bringing total xScale leasing to 300 MW |
| 2023-12-07 | DIGITAL REALTY TRUST, INC. | Joint Venture | 700 | 500 | Digital Realty forms $7 billion hyperscale development JV with Blackstone (80/20) for four campuses / ~500 MW in Frankfurt, Paris and Northern Virginia, with Blackstone contributing ~$700 million |
| 2023-11-13 | REALTY INCOME CORP | Joint Venture | 200 | 16 | Realty Income invests ~$200mm for an 80% interest in a Digital Realty build-to-suit JV developing two Northern Virginia data centers with 16 MW initial capacity expandable to 48 MW, 100% pre-leased to an S&P 100 investment-grade tenant |
| 2023-10-26 | DIGITAL REALTY TRUST, INC. | Land Acquisition | 49 | 50 | Digital Realty secures Marseille expansion land (MRS5 50-year right-of-use for 22 MW; MRS6 27 acres for EUR47mm supporting 50 MW) and sells non-core data centers in Watford, UK ($146mm) and Chantilly, VA ($43mm) |
| 2023-10-23 | Mawson Infrastructure Group Inc. | Hosting/Colocation Agreement | — | 50 | Mawson Hosting signs Service Framework Agreement (dated Oct 12, 2023) to co-locate up to 50 MW / 15,876 bitcoin miners for Consensus Colocation PA LLC (CTG) at Mawson's Midland, Pennsylvania data center facility (re-filing of the exhibit filed Oct 19, 2023) |
| 2023-10-16 | Stronghold Digital Mining, Inc. | Other | — | — | Stronghold Digital Mining signs three-year Managed Services Agreement with Frontier Outpost 8 to monitor, operate and maintain its bitcoin mining data centers at the Panther Creek and Scrubgrass power plants in Pennsylvania |
| 2023-08-09 | Riot Platforms, Inc. | Other | — | 200 | Riot Q2 2023 results: long-term purchase agreement with MicroBT for 33,280 immersion-cooled miners (7.6 EH/s, option for 66,560 more) and order for 200 MW of Midas immersion cooling systems (option for 400 MW more) for its Corsicana, Texas facility |
| 2023-07-27 | DIGITAL REALTY TRUST, INC. | Joint Venture | 2,043 | — | Digital Realty forms hyperscale JVs selling 80% of three Northern Virginia data centers to TPG Real Estate (~$1.3bn gross proceeds) and 65% of two Chicago data centers to GI Partners (~$743mm), plus Amsterdam AMS7 buy-in and Texas data center sale |
| 2023-06-05 | Cyxtera Technologies, Inc. | Sale/Divestiture | — | 251 | Cyxtera cleansing presentation discloses Chapter 11 sale process under its RSA for its 60+ data center, 251 MW global colocation platform, with initial indications of interest received and lenders potentially taking majority ownership |
| 2023-05-03 | EQUINIX INC | Power Purchase Agreement | 50 | 345 | Equinix Q1 2023 results: signs 345 MW of long-term renewable PPAs in Spain to cover Barcelona and Madrid IBX data centers, invests $50M in new Montreal IBX, and has 10 xScale projects (>90 MW) underway |
| 2023-04-27 | CORPORATE OFFICE PROPERTIES TRUST | Sale/Divestiture | 190 | — | COPT Q1 2023 supplemental reports closed sale of a 90% interest in three fully-leased Northern Virginia data center shells (P2 A, B, C) for $190mm, retaining 10% via a new JV, with four more NoVA data center shells (838k sf, 100% leased) under development |
| 2023-02-16 | DIGITAL REALTY TRUST, INC. | Sale/Divestiture | 596 | — | Digital Realty closes sale of a 25% interest in a Frankfurt data center to Digital Core REIT at a EUR558mm (~$596mm) valuation, generating ~$150mm net proceeds, alongside $55mm of land buys supporting 84 MW of future IT load |
| 2023-01-13 | Social Leverage Acquisition Corp I | SPAC Merger | — | — | Social Leverage Acquisition Corp I furnishes Needham conference transcript of its pending SPAC merger target W3BCLOUD, a Web3/HPC data center operator; no transaction terms disclosed in the document |
| 2022-11-09 | Switch, Inc. | Acquisition | 11,000 | — | Switch Q3 2022 results reaffirm pending ~$11bn all-cash take-private by DigitalBridge and IFM Investors at $34.25/share, expected to close Q4 2022; also signed 3 MW and 2 MW colocation expansions |
| 2022-10-26 | DIGITAL REALTY TRUST, INC. | Acquisition | 1,700 | — | Digital Realty completes ~$1.7bn acquisition of majority interest in Teraco (South Africa), signs agreement to sell 25% of Frankfurt data center to Digital Core REIT, and buys development land in Paris, Stockholm, Crete and Dallas |
| 2022-10-11 | Mawson Infrastructure Group Inc. | Sale/Divestiture | 40 | 80 | Mawson completes sale of its ~80 MW Sandersville, Georgia bitcoin mining facility and up to 6,468 ASICs to CleanSpark for up to ~$40 million |
| 2022-08-04 | IRON MOUNTAIN INC | Joint Venture | — | 72 | Iron Mountain leases 83 MW of data center capacity in Q2 2022, including 72 MW on its Northern Virginia campus for VA-4 and VA-5, and forms a joint venture with Hana Financial for VA-4/VA-5 in which IRM retains 55% |
| 2022-07-28 | DIGITAL REALTY TRUST, INC. | Joint Venture | — | 20 | Digital Realty announces Digital Realty Mivne JV with Mivne Real Estate to develop a multi-tenant data center campus of up to 20 MW in Petah Tikvah, Israel, and acquires development land in Dublin, Barcelona and Frankfurt supporting 125 MW |
| 2022-07-27 | EQUINIX INC | Acquisition | — | 170 | Equinix closes acquisition of four data centers in Chile from Entel (May 2022), with one additional Entel data center in Lima, Peru expected to close in Q3 2022; xScale portfolio now >170 MW leased |
| 2022-05-09 | Applied Blockchain, Inc. | Joint Venture | — | 100 | Applied Blockchain investor deck: Bitmain-affiliate AntPool JV to fund 20% of build-out of up to 1.5 GW of hosting capacity in North America; first 100 MW Jamestown, ND hosting facility (55 MW online) under a 100 MW energy services agreement |
| 2022-04-28 | DIGITAL REALTY TRUST, INC. | Land Acquisition | 132 | 144 | Digital Realty 1Q22 results: signs long-term lease with purchase option on 24-acre Paris parcel (~$132mm, ~144 MW IT) and acquires development land in Zurich (14 MW, $21mm) and Chennai via Brookfield JV (100 MW, $34mm) |
| 2022-04-28 | IRON MOUNTAIN INC | Lease | — | 72 | Iron Mountain signs a 72 MW near build-to-suit data center lease on its Northern Virginia campus (April 2022) after a record 35 MW of Q1 leasing including full lease-up of the 27 MW LON-2 site; raises 2022 leasing target from 50 MW to 130 MW |
| 2022-04-28 | CORPORATE OFFICE PROPERTIES TRUST | Sale/Divestiture | 223 | 19 | COPT sells its 19.25 MW DC-6 wholesale data center in Manassas, Virginia for $223mm and places 265k sf Oak Grove C Northern Virginia data center shell in service 100% leased |
| 2022-04-27 | EQUINIX INC | Joint Venture | — | 100 | Equinix Q1 2022 earnings release: completes xScale joint ventures with PGIM (Australia, >55 MW Sydney) and GIC (South Korea, >45 MW Seoul), closes MainOne acquisition in West Africa and announces Entel data center acquisition in Chile |
| 2022-04-06 | 10X Capital Venture Acquisition Corp. II | SPAC Merger | 1,250 | 110 | PrimeBlock, a crypto-mining data center operator with 110+ MW installed across 12 facilities, agrees to merge with SPAC 10X Capital Venture Acquisition Corp. II at a $1.25bn enterprise value, backed by a $300mm committed equity facility from Cantor Fitzgerald affiliate |
| 2022-03-25 | CyrusOne Inc. | Acquisition | 15,000 | — | KKR and Global Infrastructure Partners complete ~$15bn all-cash acquisition of data center REIT CyrusOne; shares delisted from Nasdaq |
| 2022-03-21 | Mawson Infrastructure Group Inc. | Hosting/Colocation Agreement | 20 | 100 | Mawson Q4/FY2021 results: signs 100 MW hosting co-location agreement and $20mm debt facility with Celsius Mining, new 100 MW Midland, PA facility, 12 MW Foundry Digital hosting deal, and Sandersville, GA expansion approved to 230 MW |
| 2022-02-16 | CyrusOne Inc. | Sale/Divestiture | 670 | 101 | CyrusOne Q4 2021 results: pending ~$15bn enterprise-value take-private by KKR and GIP (stockholder-approved Feb 1, 2022), definitive agreement to sell four Houston data centers to DataBank for ~$670mm (5.19% cap rate), and record 101 MW leased in the quarter |
| 2022-02-16 | EQUINIX INC | Joint Venture | — | — | Equinix Q4 2021 earnings release recapping its pending acquisition of MainOne (West Africa), a $575mm xScale JV with PGIM Real Estate in Australia and a $525mm xScale JV with GIC for two Seoul data centers |
| 2022-02-10 | CORPORATE OFFICE PROPERTIES TRUST | Sale/Divestiture | 222 | 19 | COPT sells 100% of COPT DC-6, its 19.25 MW wholesale data center and sole Wholesale Data Center segment asset, for $222.5mm on January 25, 2022 to fund development |
| 2022-01-27 | EQUINIX INC | Joint Venture | 525 | 45 | Equinix and GIC form US$525 million joint venture to develop two xScale hyperscale data centers (SL2x, SL3x) in Seoul, Korea |
| 2021-11-15 | Sila Realty Trust, Inc. | Sale/Divestiture | 1,320 | — | Sila Realty Trust completes sale of its entire 29-property data center portfolio for $1.32bn, using proceeds to repay $450.8mm of notes and $403mm on its credit facility and pay a $1.75/share special distribution |
| 2021-11-04 | DigitalBridge Group, Inc. | Acquisition | 539 | 24 | DigitalBridge 3Q21 presentation reports Vantage SDC's closed $539mm acquisition of CA22, a 24 MW hyperscale data center adjacent to CA21, plus AtlasEdge's acquisition of 12 Colt data centers across 11 European markets |
| 2021-11-03 | EQUINIX INC | Joint Venture | 575 | — | Equinix Q3 2021 results announce a $575mm xScale hyperscale data center joint venture with PGIM Real Estate in Australia and closing of the GPX India acquisition |
| 2021-10-28 | CyrusOne Inc. | Lease | 38 | 20 | CyrusOne Q3 2021 results: leased 20 MW / 100,000 CSF ($37.8mm annualized GAAP revenue) and acquired land in Frankfurt and San Antonio supporting ~21 MW each |
| 2021-10-26 | DIGITAL REALTY TRUST, INC. | Sale/Divestiture | 581 | — | Digital Realty 3Q21 results: PGIM Real Estate / Digital Realty JV sells 10-data-center North American portfolio for $581mm (~4.5% exit cap on seven stabilized assets); closes India JV with Brookfield; new JV with Pembani Remgro acquires control of Medallion Communications (Nigeria) for ~$29mm |
| 2021-10-19 | Landmark Infrastructure Partners LP | Debt Financing | — | — | Landmark Infrastructure closes securitization of 12 data centers (11 U.S., 1 Canada) via Secured Data Center Revenue Notes issued by DI Issuer LLC under an October 13, 2021 indenture, with Landmark's GP as manager |